C04398-2015

SECURITIES AND EXCHANGE COMMISSIONSEC FORM 17-C

CURRENT REPORT UNDER SECTION 17
OF THE SECURITIES REGULATION CODE
AND SRC RULE 17.2(c) THEREUNDER

1. Date of Report (Date of earliest event reported)
Aug 6, 2015
2. SEC Identification Number
AS094-008880
3. BIR Tax Identification No.
004-471-419
4. Exact name of issuer as specified in its charter
PETROENERGY RESOURCES CORPORATION
5. Province, country or other jurisdiction of incorporation
Metro Manila, Philippines
6. Industry Classification Code(SEC Use Only)
7. Address of principal office
7th Floor, JMT Building, ADB Ave., Ortigas Center, Pasig City Postal Code 1600
8. Issuer's telephone number, including area code
(02) 6372917
9. Former name or former address, if changed since last report
--
10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA
Title of Each Class Number of Shares of Common Stock Outstanding and Amount of Debt Outstanding
common 410,736,330
11. Indicate the item numbers reported herein
Item No. 9

The Exchange does not warrant and holds no responsibility for the veracity of the facts and representations contained in all corporate disclosures, including financial reports. All data contained herein are prepared and submitted by the disclosing party to the Exchange, and are disseminated solely for purposes of information. Any questions on the data contained herein should be addressed directly to the Corporate Information Officer of the disclosing party.

PetroEnergy Resources CorporationPERC

PSE Disclosure Form 4-13 - Clarification of News Reports References: SRC Rule 17 (SEC Form 17-C) and
Section 4.4 of the Revised Disclosure Rules

Subject of the Disclosure

Clarification on the BusinessWorld Online Article

Source BusinessWorld Online
Subject of News Report Conergy to build 50-MW Tarlac solar facility
Date of Publication Aug 5, 2015
Clarification of News Report

This is to clarify the news article entitled “Conergy to build 50-MW Tarlac solar facility for PetroEnergy unit” posted in BusinessWorld Online on August 5, 2015. The article reported that:

“GERMANY’S Conergy AG has been tapped to build a 50-megawatt (MW) solar farm in Tarlac, which will serve as PetroEnergy Resources Corp.’s maiden venture into the sector.

In a statement yesterday, the photovoltaic solution and service provider said PetroSolar Corp., a unit of PetroEnergy, awarded the contract for the Tarlac solar power project.

The project will be built within a 55-hectare property near Hacienda Luisita in Tarlac City.
Conergy said the installation will have a plant size of 550,003 square meters and can produce 78,070 MW-hour of power per year to some 31,700 households.

. . . .

This project will serve as the first collaboration between Conergy and PetroSolar, which is jointly owned by PetroEnergy’s renewable energy (RE) arm -- PetroGreen Energy Corp. (PGEC) and EEI Power Corp. (EEIPC).

. . . . ”


We confirm that PetroSolar (PetroSolar) Corporation has awarded to Conergy Asia & ME Pte. Ltd. the contract for the supply and construction of the solar plant for the 50 MW Tarlac Solar Power Project (TSPP) in Tarlac City. The TSPP is being developed through the Department of Energy (DOE)-awarded Solar Energy Service Contract (SESC) No. 2015-03-115. The SESC was originally awarded to PetroEnergy Corporation’s (PERC) subsidiary, PetroGreen Energy Corporation (PGEC), which later on assigned the SESC to PetroSolar. PetroSolar is owned by PGEC (56%) and EEI Power Corporation (44%).

We trust that we have adequately addressed your concerns.

Thank you.

Other Relevant Information

--

Filed on behalf by:
Name Arlan Profeta
Designation Head/ Alternate Chief Information Officer