C04463-2022

SECURITIES AND EXCHANGE COMMISSIONSEC FORM 17-C

CURRENT REPORT UNDER SECTION 17
OF THE SECURITIES REGULATION CODE
AND SRC RULE 17.2(c) THEREUNDER

1. Date of Report (Date of earliest event reported)
Jun 16, 2022
2. SEC Identification Number
C199800134
3. BIR Tax Identification No.
200-652-460-000
4. Exact name of issuer as specified in its charter
ABOITIZ POWER CORPORATION
5. Province, country or other jurisdiction of incorporation
Philippines
6. Industry Classification Code(SEC Use Only)
7. Address of principal office
32nd Street, Bonifacio Global City, Taguig City, Metro Manila, Philippines Postal Code 1634
8. Issuer's telephone number, including area code
02 8886 2800
9. Former name or former address, if changed since last report
N/A
10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA
Title of Each Class Number of Shares of Common Stock Outstanding and Amount of Debt Outstanding
Common Stock P1 Par Value 7,358,604,307
11. Indicate the item numbers reported herein
9

The Exchange does not warrant and holds no responsibility for the veracity of the facts and representations contained in all corporate disclosures, including financial reports. All data contained herein are prepared and submitted by the disclosing party to the Exchange, and are disseminated solely for purposes of information. Any questions on the data contained herein should be addressed directly to the Corporate Information Officer of the disclosing party.

Aboitiz Power CorporationAP

PSE Disclosure Form 4-30 - Material Information/Transactions References: SRC Rule 17 (SEC Form 17-C) and
Sections 4.1 and 4.4 of the Revised Disclosure Rules

Subject of the Disclosure

Penalty imposed on Hedcor Bukidnon for exceeding allowed outages per year

Background/Description of the Disclosure

Hedcor Bukidnon, Inc. (HBI) informed Aboitiz Power Corporation (AboitizPower) that, as part of the ongoing review and investigation conducted by the Energy Regulatory Commission (ERC) on Philippine power generation companies, the ERC promulgated a Decision dated June 15, 2022 directing HBI to pay the total penalty of Php8,380,000.00 for having incurred outage allowance days over the period January 3, 2021 to April 25, 2021 in excess of the ERC standard of 6.8 days of allowed outages per year.

The case arose after torrential rains resulted in landslides that caused extensive damage to the run-of-river hydro units of HBI in Manolo Fortich, Bukidnon, which was the subject of an AboitizPower disclosure dated September 3, 2020. The extent of the damage resulting from the landslides was such that HBI required 102.1 days of excess unplanned outage days to bring each of the Manolo Fortich 1 Hydroelectric Power Plant’s Unit 3 and Unit 4 back online.

HBI will be filing a Motion for Reconsideration seeking to overturn the ERC's Decision.

HBI is part of the Hedcor Group and operates and maintains the Manolo Fortich 1 and 2 which are run-of-river hydroelectric power plants located in Manolo Fortich, Bukidnon. HBI is a wholly owned subsidiary of Aboitiz Renewables Inc., AbotizPower’s holding company for renewable
energy projects

Other Relevant Information

See attached the full disclosure.

Filed on behalf by:
Name Mailene de la Torre
Designation Asst. Corporate Secretary